The furniture order is won and lost before production starts
Design is the cost of entry, and it is unpriced
In contract furniture the expensive work happens first. A site is measured, a layout is drawn, renders are produced, finishes are proposed, and a ninety-line bill of quantities is priced. All of that is done free, in the hope of a purchase order, and most manufacturers have no idea how much of it they give away in a year.
The reason is that revisions are invisible. Version four of a layout looks the same as version one in the project folder. Nobody counts. A CRM that logs each revision with the reason it was requested turns an unmeasured cost into a number, which is the only way a design head can ever say "the next revision is chargeable" with a straight face and a record behind them.
The specifier decides more than the buyer does
For office, hospitality and institutional projects, the architect, interior designer or fit-out contractor usually shapes the specification long before procurement is involved. Manufacturers who track only the paying client are managing the last third of the process. Holding the specifier on the project record, and keeping a register of what each one has specified before, turns a set of personal relationships into a channel that survives a salesperson leaving.